Project Description

Customer: FIAT Chrysler Automobiles
Location: Ranjangaon MIDC
Area: Pune

Key Facts:
Project Capacity1273 KWp
Proposed Annual Generation20,90,902 KWh
Estimated COReduction1860 ton/Year
Proposed LocationIndustrial Rooftop at Body Shop
Area RequiredApprox 8000 Sq Mtr
Project Timeline2 Months
Project ScopeDesign, Engineering, Procurement, Constriction & Maintenance
Project Finance ModeOPEX

 

The Beginning:

FIAT team was seeking a high influential way out to establish the firm’s solid commitment to the environment and its leadership in sustainability in a cost-effective manner. Leveraging the massive roof of the Ranjangaon unit to install a solar project seemed to be a fantastic place to start; however, planning, investing, executing and operating such a project in-house would have diverted capital, time and resources from core business.

Realization of Thoughts:

FIAT has started their green initiative from 10 KW to 100 KW and now entered with 1.27 MW.
PowerSun has designed this project on mainly 3 different roofs with 3 different inclination angle.
It took 1.5 Months to construct this plant with technically sound. Skilled work force of 20.

Key Facts:
  • PowerSun took the responsibility to installing and operating a high quality Industrial roof top solar PV project with Investment from Renowned Asset Owner.
  • PowerSun executed India’s first Non-penetrated Industrial rooftop solar PV power plant in MW class with new INNOVATION.
  • FIAT’s any non productive days power consumption is equal to this solar PV power plants generation.
  • FIAT is substantially savings on every unit of solar power that displaces traditional power. Shading and lowers temperature for the manufacturing unit are also a benefits for FIAT